Hotline 092-3636-914
Silicon TechsSILICON TECHSSilicon Techs Co., Ltd.

Fertilizer by crop

Durian

The Silicon Techs durian programme — five stages, tested in our Chanthaburi demonstration orchard in the 2026 season (6-year-old Monthong, 20 trees/rai). Yield was 30% higher than with standard fertilizer alone.

Year-round fertilizer calendar

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
1Post-harvest recovery & soil care
2Leaf flushes & food reserves
3Build reserves & induce flowering
4Flowering, fruit set & early sizing
5Pulp filling (2 months before harvest)
✂Harvest

Coloured bars show when to apply at each stage. The current month is highlighted.

Stage-by-stage plan

1

Jun – Jul

Post-harvest recovery & soil care

Trees are exhausted, soil is acidic and feeder roots are damaged — fix the soil and regrow roots first.

Recommended

Rate & method: Broadcast Orthosilicic Acid+ Gold powder 3 kg/tree to correct soil pH → Mor Kaset Plus 6-6-6 at 2 kg/tree → one month later 15-15-15 at 2.5 kg/tree.

Or choose

On very acidic soil (pH below 5), use orthosilicic acid powder instead of dolomite to add silicon from the start.

Add every time you fertilize

Mor Durian at 0.25–0.5 kg/tree every time you fertilize, without cutting your usual NPK (use 0.5 kg for large or heavily loaded trees).

Choose the approach that fits your farm

Easy start — keep your formulas

Keep your usual fertilizer, add Mor Durian 0.25–0.5 kg/tree each time and use orthosilicic acid powder instead of dolomite after harvest. Extra cost about 616–1,232 baht/rai for 15–20% more yield.

Recommended

Full programme

Follow all five stages above. In our demonstration orchard it gave 30% more yield and 60% more net profit than standard fertilizer.

Organic focus for tired soil

For compacted, low-organic soils, use OM 20% organic fertilizer or Mor Kaset Plus 10-0-4 (OM 50%) with Mor Durian, then add NPK by stage.

Good to know

  • In the south, timings run about 2–3 months later than the east — follow the tree’s stage rather than the calendar.
  • Apply on moist soil around the canopy edge, then water in.
  • Avoid high-nitrogen formulas during flower induction and just before harvest.

Rates on this page are general guidance for bearing trees. Adjust for tree age, canopy size, crop load and soil test results. Months are approximate and vary by region.

Source: Silicon Techs durian programme and trial report (2026)

Not sure? Ask a local dealer — our team will visit your farm.

Want a plan for your own farm?

Tell us your crop, tree age and the problems you see — our agronomists will plan it with you for free.

Call us Chat on LINE